Prime Minister Yousuf Raza Gilani addresses a press conference in Islamabad.—AFP/File

Lahore: Prime Minister Yousuf Raza Gilani acknowledged energy crisis was affecting every sector of the country and expressed determination to overcome it with the cooperation of all stake holders.

Addressing second national energy conference here on Monday, Gilani said massive load shedding has resulted in heavy losses to the economy and every segment of society has been disturbed.

“Due to efforts of the government the situation has been improved. However, it is essential to chalk out long term strategy to enhance power generation,” Gilani said.

“We will have to make collective and individual efforts to boost electricity generation through various means to get rid of load shedding,” he stressed.

He assured the government will give serious consideration to proposals of the conference to increase electricity generation and reduce load shedding in minimum time.

“Unfortunately we inherited net shortfall of 5000MW and made strenuous efforts to increase generation. There is need to further concentrate on enhancing generation.”

The prime minister said that as a result of measures taken by the PPP-led government a total of 3400MW electricity has been inducted in the national grid.

He felt people will have to play part by consuming less power as energy requirements in the country are enhanced by seven per cent every year.

He said power tariff has been increased due to increase in petroleum products prices in the international markets.

Earlier in welcome address, Punjab Chief Minister Shahbaz Sharif spoke on current energy situation in the country specially in Punjab province.

He suggested one-window operation at Prime Minister House to solve problems of power generation.

Chief ministers of the provinces, federal ministers and other officials also attended the conference.

The participants suggested various measures in order to overcome energy crisis.

Water and Power Minister Syed Naved Qamar said the government was working to overcome the crisis for which number of steps has already been implemented.

Petroleum Minister Dr Asim Hussain said that short and long term projects were the need of the hour to control the crisis.

It is important to reduce production cost of electricity, he said.

He advised people to consider using LGP because it was cheaper as compare to petrol and diesel.

Opinion

Editorial

Immunity gap
26 Apr, 2026

Immunity gap

VACCINES rarely make the headlines unless there is an outbreak. This World Immunisation Week, it is a moment to...
Danger on repeat
26 Apr, 2026

Danger on repeat

DISASTERS have typically been framed as acts of nature. Of late, they look increasingly like tests of preparedness...
Loose lips
26 Apr, 2026

Loose lips

PAKISTANIS have by now gained something of an international reputation for their gallows humour, but it seems that...
Lebanon truce
Updated 25 Apr, 2026

Lebanon truce

THE fact that the truce between Israel and Lebanon has been extended for three weeks should be welcomed. But there...
Terrorism again
25 Apr, 2026

Terrorism again

THE elimination of 22 terrorists in an intelligence-based operation in Khyber highlights both the scale and ...
Taxing technology
25 Apr, 2026

Taxing technology

THE recent decision by the FBR’s Directorate General of Customs Valuation to increase the ‘assessed value’ of...