SAHIWAL: With installation of an additional 132KV transformer and shifting of power supply line from Jaranwala-Tandliyanwala feeder to Yousafwala grid station, the tripping and prolonged outages issues in Sahiwal division will be resolved.

Punjab Agriculture Minister Dr Farrukh Javed told Dawn that after thorough consultations with Multan Electric Power Company (Mepco) chief Mr Fazalullah, Fesco head Chaudhry Ilyas, NTDC, Islamabad, P&W Secretary Younas Daga and state minister Abid Sher Ali, a plan to solve Sahiwal’s power problem had been devised.

For the purpose, Mepco had been directed to immediately buy an extra 132KV transformer and install it at Yousafwala grid station within a week.

He said after installation of the additional transformer, Sahiwal would be de-linked from Jaranwala and Tandliyawala feeder and power supply would be shifted to Yousafwala grid station.

He said temporary shifting of power supply line was already done.

Published in Dawn, June 21th, 2016

Opinion

Editorial

Islamabad march
Updated 27 Nov, 2024

Islamabad march

WITH emotions running high, chaos closes in. As these words were being written, rumours and speculation were all...
Policing the internet
27 Nov, 2024

Policing the internet

IT is chilling to witness how Pakistan — a nation that embraced the freedoms of modern democracy, and the tech ...
Correcting sports priorities
27 Nov, 2024

Correcting sports priorities

IT has been a lingering battle that has cast a shadow over sports in Pakistan: who are the national sports...
Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...