KARACHI: The Ministry of Science and Technology has taken the initiative for “engineering foresight” to gear up auto assemblers and parts makers for new challenges, especially electric vehicles (EVs). Various countries including the United States and India have already unveiled their plans for introducing EVs.

The ministry has shared a “Draft Technology Foresight Report on Auto Sector” with the local assemblers, auto parts makers and universities seeking their input. The report will be discussed and finalised in the third meeting to be held on September 12, 2017.

The volumes are low in Pakistan but there is a need to start working on capacity building for institutions so that in future the country is well placed in adopting new technologies of electric vehicles and has the human resources to cope with challenges of the technology, the ministry said.

The science ministry feels that when EV technology is available it will not just impact the auto sector but it will also affect the power utility industry, petroleum, construction and building industries for providing charging facilities and urban transportation.

EV offers zero tail pipe emission and reduction in noise, which is the most desirable scenario for growing urban centres all over the world, the ministry said.

It also said there is a lot of hype about EV in the world and Pakistanis are being affected by it. However, we should not race forward, but move towards it in a pragmatic manner, the ministry added.

The ministry said an argument can be made that in Pakistan fossil fuel vehicles will continue for a longer period, especially in the lower strata, due to their lower cost. It is estimated that the cost of battery, which forms about half the cost of an electric vehicle, will in 12 to 15 years, reduce to an extent that the total ownership cost of EV will be equal to that of a fossil fuel vehicle.

A local car or a light-weight combat vehicle manufacturer in this transition period will be challenged to produce a small fossil fuel vehicle, around 600 to 800 CC with an outlook for 20 years, and at an appropriate time tie up with an EV manufacturer to co-develop an EV appropriate for our market. This activity requires deep pockets and unstinted support by the government.

Published in Dawn, September 10th, 2017

Follow Dawn Business on Twitter, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

Kurram atrocity
Updated 22 Nov, 2024

Kurram atrocity

It would be a monumental mistake for the state to continue ignoring the violence in Kurram.
Persistent grip
22 Nov, 2024

Persistent grip

An audit of polio funds at federal and provincial levels is sorely needed, with obstacles hindering eradication efforts targeted.
Green transport
22 Nov, 2024

Green transport

THE government has taken a commendable step by announcing a New Energy Vehicle policy aiming to ensure that by 2030,...
Military option
Updated 21 Nov, 2024

Military option

While restoring peace is essential, addressing Balochistan’s socioeconomic deprivation is equally important.
HIV/AIDS disaster
21 Nov, 2024

HIV/AIDS disaster

A TORTUROUS sense of déjà vu is attached to the latest health fiasco at Multan’s Nishtar Hospital. The largest...
Dubious pardon
21 Nov, 2024

Dubious pardon

IT is disturbing how a crime as grave as custodial death has culminated in an out-of-court ‘settlement’. The...