ISLAMABAD: The National Highway Authority (NHA) has approved the construction of a 1.75km, four-lane bridge across river Indus linking Layyah with Taunsa at a cost of around Rs2.6 billion.

The approval was granted on Wednesday in an Executive Board meeting of the Authority at the NHA headquarters. Chairman Shahid Ashraf Tarar chaired the meeting.

Sharing details of the project, Mr Tarar said the bridge would provide the much-needed connectivity because, at present, there was no river crossing over Indus to provide link between the two cities. The two available links were D.I. Khan-Darya Bridge located 88km upstream of the proposed project site and Taunsa Barrage located 52km downstream of it. The city dwellers travel by road from Layyah to Taunsa or vice versa, covering a distance of about 100km to reach either of the two cities. Alternatively, boat/ferry service was available from either side of the river to carry the residents across the river. The ferry service takes almost 1.25 hours to reach from Layyah to Taunsa and vice versa.

The construction of the bridge would reduce the distance by up to 50km. Similarly, it would also facilitate traffic movement from east to west by providing link between Indus Highway (N-55) and Motorway M-4. The west bank of River Indus (Taunsa) would be connected with the provincial road network passing through the eastern side of the river through district Jhang, Faisalabad and Sheikhupura. The improved connectivity will uplift the socio-economic condition of these areas as well, the NHA chief said.

Published in Dawn, November 2nd, 2017

Opinion

Editorial

Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...
Anti-women state
Updated 25 Nov, 2024

Anti-women state

GLOBALLY, women are tormented by the worst tools of exploitation: rape, sexual abuse, GBV, IPV, and more are among...
IT sector concerns
25 Nov, 2024

IT sector concerns

PRIME Minister Shehbaz Sharif’s ambitious plan to increase Pakistan’s IT exports from $3.2bn to $25bn in the ...
Israel’s war crimes
25 Nov, 2024

Israel’s war crimes

WHILE some powerful states are shielding Israel from censure, the court of global opinion is quite clear: there is...