GWADAR: The chairman of the Senate’s Standing Sub-Committee on Planning and Development, Shahzeb Durrani, has called for installation of desalination plants to solve the problem of drinking water shortage in Gwadar and its adjacent areas.

He said this during a meeting held in Gwadar on Monday. The meeting was also attended by Senator Muhammad Mohsin Laghari, Public Health Engineering (PHE) department’s Chief Engineer Nawaz Sheikh and other officials, Port Authority Director General Dr Sajjad Baloch and Gwadar’s Deputy Commissioner Naeem Bazai.

Mr Bazai informed the meeting about the water crisis and alternate measures to resolve the issue.

Mr Durrani along with some officials also visited the newly-constructed Swad dam, Ankra Kour dam and Karwat desalination plant.

Officials said that the PHE and the local administration were supplying drinking water to Gwadar from Mirani dam through tankers at a cost of Rs240 million per month.

They said construction of Swad dam had been completed and pipelines were being laid to connect it with the water distribution system in Gwadar.

Published in Dawn, February 27th, 2018

Opinion

Editorial

Islamabad march
Updated 27 Nov, 2024

Islamabad march

WITH emotions running high, chaos closes in. As these words were being written, rumours and speculation were all...
Policing the internet
27 Nov, 2024

Policing the internet

IT is chilling to witness how Pakistan — a nation that embraced the freedoms of modern democracy, and the tech ...
Correcting sports priorities
27 Nov, 2024

Correcting sports priorities

IT has been a lingering battle that has cast a shadow over sports in Pakistan: who are the national sports...
Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...