KPT hits back, says all piers open

Published September 1, 2018

ISLAMABAD: The Karachi Port Trust (KPT) on Friday hit back at the Petroleum Division and the oil industry, saying they were not giving the full picture and hiding their own shortcomings while complaining against the closure of an oil pier at KPT.

The response came in reaction to a letter from the Ministry of Petroleum, which cited Oil Companies Advisory Committee (OCAC) complaints that closure of OP-3 at the Karachi Port could lead to product shortages.

In its response, the KPT said the oil pier in question was not closed and vessels were in fact berthing there. Since June 23 vessels had berthed there, KPT claimed in its reaction, adding six of them belonged to OCAC and 17 were private. It said one reason for so-called shortage of petrol (Mogas) could be to slow discharge rate of oil tankers against the established norms of KPT.

It said the Oil Marketing Companies (OMCs) were also consuming longer time in getting the survey and sampling of product prior to discharge, which was the responsibility of importers and the OMC.

An official said a petrol vessel imported by a leading private oil companies was rejected by the Hydrocarbon Development Institute of Pakistan (HDIP) because of shortcomings against approved specifications and had to be moved out of the pier and was still standing in the deep waters. This caused about six-day loss.

The KPT alleged that OMCs infrastructure system comprising pipelines and storage facilities was the main reason and cause of slow discharge rate which forces longer stay of ships alongside oil piers and thus longer turn-around time. Moreover, if the sample fails, then ship has to wait for extra 12 hours to be pulled out of harbour.

It explained that Karachi Port had three oil piers and out of these, Oil Pier 1 (OP-1) was completely dedicated to OCAC for berthing its vessels as and when they call at the port. This berth is given to other companies only when it is not required by the OCAC.

Berthing sequence at OP-2 is undertaken on a first come first serve basis and at OP-3 two plus one strategy is followed — which means two ships of OCAC are berthed first followed by one ship of other stakeholders, if requested.

KPT has ample berthing space to accommodate OCAC ships of petrol and crude oil provided they are properly managed by OCAC, the port operator insisted in an interaction with Dawn. More importantly, KPT has no role in allocating the berthing sequence to OCAC ships.

Interestingly, on the basis of concerns highlighted by the Petroleum Division, the KPT has convened an urgent meeting on Monday (Sept 3) with all the stakeholders to discuss proposed “reconstruction of OP-1 and repair/maintenance of OP-3”.

Those invited to meeting include the Pakistan National Shipping Corporation (PNSC) chairman, Director-General Oil of Petroleum Division, representations of Terminals Association of Pakistan, OCAC, PSO and Pakistan Shipping Agents Association.

On Aug 27, the Petroleum Division of the Ministry of Energy had complained for non-availability of a couple of piers of KPT, causing serious logistical issues for the berthing of crude oil and finished products and affecting local oil refining. It had sought intervention of the KPT chairman and secretary maritime affairs to address the situation.—KK

Published in Dawn, September 1st, 2018

Follow Dawn Business on Twitter, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

Counterterrorism plan
Updated 23 Nov, 2024

Counterterrorism plan

Lacunae in our counterterrorism efforts need to be plugged quickly.
Bullish stock market
23 Nov, 2024

Bullish stock market

NORMALLY, stock markets rise gradually. In recent months, however, Pakistan’s stock market has soared to one ...
Political misstep
23 Nov, 2024

Political misstep

FORMER first lady Bushra Bibi’s video address to PTI followers has triggered a firestorm. Her assertion implying...
Kurram atrocity
Updated 22 Nov, 2024

Kurram atrocity

It would be a monumental mistake for the state to continue ignoring the violence in Kurram.
Persistent grip
22 Nov, 2024

Persistent grip

An audit of polio funds at federal and provincial levels is sorely needed, with obstacles hindering eradication efforts targeted.
Green transport
22 Nov, 2024

Green transport

THE government has taken a commendable step by announcing a New Energy Vehicle policy aiming to ensure that by 2030,...