AT a water conference ‘Political Economy and Issues of Water Management’ held in Karachi some time ago, some speakers spoke of the desilting of dams for meeting Pakistan’s water needs.

Desilting Tarbela dam, where silt has continued to accumulate since early 1990s is impossible without disrupting hydropower generation and the downstream irrigation system for several years. The latest desilting or sediment flushing study of Tarbela dam, presented to the Senate in 2016, concluded sediment flushing is technically difficult and uneconomical with a negative rate of return. Allowing an unmitigated accumulation of silt in Tarbela reservoir was a mistake. This has depleted about four million acres feet of irrigation storage so far and continues that depletion at an average annual rate of 120,000 acres feet.

All out efforts should be made to save the remaining capacity of Tarbela reservoir by controlled sluicing out of fine silt with the help of appropriate technology, monitoring and controls, without disrupting the power generation and downstream irrigation system. Otherwise, Tarbela would also become a run-of-river project like Warsak dam.

Akram Khan

Lahore

Published in Dawn, June 29th, 2019

Opinion

Editorial

Islamabad march
Updated 27 Nov, 2024

Islamabad march

WITH emotions running high, chaos closes in. As these words were being written, rumours and speculation were all...
Policing the internet
27 Nov, 2024

Policing the internet

IT is chilling to witness how Pakistan — a nation that embraced the freedoms of modern democracy, and the tech ...
Correcting sports priorities
27 Nov, 2024

Correcting sports priorities

IT has been a lingering battle that has cast a shadow over sports in Pakistan: who are the national sports...
Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...