Iran starts new operations at heavy water reactor

Published December 24, 2019
The nuclear water reactor of Arak during a visit by the head of the Iran’s Atomic Energy Organisation, Ali Akbar Salehi (unseen), on Monday.—AFP
The nuclear water reactor of Arak during a visit by the head of the Iran’s Atomic Energy Organisation, Ali Akbar Salehi (unseen), on Monday.—AFP

TEHRAN: Iran began new operations on Monday at a heavy water nuclear reactor, the head of the country’s nuclear agency said.

The move was seemingly designed to intensify pressure on Europe to find an effective way around US sanctions that block Tehran’s oil sales abroad.

Starting up the Arak heavy water reactor’s secondary circuit doesn’t violate Iran’s 2015 nuclear deal with world powers. But it does inch Tehran’s programme closer towards weapons-grade levels.

Ali Akbar Salehi explained to state TV that the secondary circuit transfers heat to the reactor’s cooling system. He said the entire reactor system will go online in 2021.

Heavy water helps cool reactors, producing plutonium as a byproduct that can potentially be used in nuclear weapons. Iran insists its nuclear programme is for peaceful purposes.

Britain is helping Iran redesign the Arak reactor to limit the amount of plutonium it produces. London has filled the role left after the US unilaterally withdrew from the nuclear deal last year.

Tehran has slowly stepped up violations of the nuclear deal to pressure world powers to provide more incentives to make up for the US withdrawal from the deal. American economic sanctions are having a crushing effect on Iran’s economy.

On Sunday, Adm. Ali Shamkhani of Iran’s Supreme National Security Council warned that his country will take another step in lowering its commitment to the deal, if Europe does not implement its commitments.

The International Atomic Energy Agency, the UN’s nuclear watchdog, said last month that Iran breached another limit of the nuclear deal by stockpiling more heavy water than the accord allowed.

Also in November, Washington renewed sanctions waivers that allow Russia and other European nations to conduct civilian nuclear cooperation with Iran, specifically the redesign work to continue at the Arak reactor and at the Fordo uranium enrichment facility. Both sites are monitored by the IAEA.

Iranian state media said technicians switched on a secondary circuit at Arak, a plant built to produce the heavy water used as a moderator to slow down reactions in the core of nuclear reactors.

“Today we are ... starting a noteworthy section of the reactor,” the head of Iran’s atomic agency, Ali Akbar Salehi, said in remarks broadcast live on state TV.

“The Arak heavy water nuclear reactor ... consists of two circuits,” Mehr said.

“The first circuit is tasked with removing heat from the heart of the reactor, and the secondary circuit is responsible for transferring the heat from the first circuit to cooling towers and finally to the outside environment,” Mehr added.

Iran agreed to shut down the reactor at Arak, — about 250 km southwest of Tehran — under the 2015 deal. The foreign powers that signed the pact said the plant could eventually have produced plutonium, which can also be used in atom bombs.

But Iran was allowed to produce a limited amount of heavy water and Tehran has been working on redesigning the reactor. Tehran says it will make isotopes for medical and agricultural use.

The control room of the reactor, named Khondab, will take about five to six months to build and the remaining systems will be completed in about one year, Salehi told a news conference at the site.

Published in Dawn, December 24th, 2019

Opinion

Editorial

A new direction
Updated 18 Mar, 2025

A new direction

While kinetic response may temporarily disable violent actors, it will not address underlying factors providing ideological fuel to insurgencies.
BTK settlement
18 Mar, 2025

BTK settlement

WHEREVER the money goes, controversy follows. The PMLN-led federal government, which recently announced that it will...
Sugar crisis
18 Mar, 2025

Sugar crisis

GREED knows no bounds. But the avarice of those involved in the sugar business — from manufacturers to retailers...
NAP revival
Updated 17 Mar, 2025

NAP revival

This bloody cycle of violence will continue unless action is complemented with social, economic, political efforts in Balochistan and KP.
New reality
17 Mar, 2025

New reality

THE US retreat from global climate finance commitments could not have come at a worse time. Pakistan faces an...
Killer traffic
17 Mar, 2025

Killer traffic

MYSTERIOUS and unstoppable. It is these words that perhaps best describe the recent surge in traffic-related...