CHIEF Minister Syed Murad Ali Shah and Senior Minister Sharjeel Inam Memon receive a briefing from irrigation officials at Sukkur Barrage’s damaged gates, on Monday—Dawn
CHIEF Minister Syed Murad Ali Shah and Senior Minister Sharjeel Inam Memon receive a briefing from irrigation officials at Sukkur Barrage’s damaged gates, on Monday—Dawn

SUKKUR: Chief Minister Syed Murad Ali Shah on Monday visited Sukkur Barrage and inspected the repair and rehabilitation work started after the June 20 damage to its two gates – Nos. 44 and 47.

Irrigation Secretary Zarif Khero briefed the CM about extent of the damage and said that the repair work had been started on an emergency basis. All available resources were being utlised, he added.

“The Irrigation Department is determined to ensure repair of both gates and restore supplies to all canals off-taking from Sukkur Barrage … ,” said Mr Khero.

CM Shah noted that a five-member committee had already been formed to investigate the incident and determine the cause of the damage.

Meanwhile, a statement issued by Irrigation Minister Jam Khan Shoro on Monday said that concerted efforts were under way to restore water supply to the affected canals by expeditiously activating Sukkur Barrage.

He held out the assurance that repair and maintenance works were being carried out on a war footing to ensure that the barrage was restored to its optimal functioning level.

The minister also directed the authorities concerned to take all necessary measures to minimise disruption in water supply and ensure that the affected canals were replenished at the earliest.

The minister announced that the Standard Operating Procedure (SOP) for gate No. 47 had been prepared, paving the way for its restoration.

He said that the Chinese engineers who were already working at the barrage before the recent accident were currently engaged in the repair of the gate No. 44.

The minister said that a camp had been set up at the barrage where engineers and experts were working day and night.

Jam Khan Shoro said that the committee formed to investigate the damage was supposed to submit its report within five days.

Published in Dawn, June 25th, 2024

Opinion

Editorial

Islamabad march
Updated 27 Nov, 2024

Islamabad march

WITH emotions running high, chaos closes in. As these words were being written, rumours and speculation were all...
Policing the internet
27 Nov, 2024

Policing the internet

IT is chilling to witness how Pakistan — a nation that embraced the freedoms of modern democracy, and the tech ...
Correcting sports priorities
27 Nov, 2024

Correcting sports priorities

IT has been a lingering battle that has cast a shadow over sports in Pakistan: who are the national sports...
Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...