HARIPUR, March 5: Owing to increasing demands of water discharge by the Indus River Authority System and decreasing water inflow, water level in the Tarbela Dam has dropped and it is about 9 feet above the dead level.

“The water table is shrinking by 1.5 to 2 feet daily,” said an official source privy to the data of daily inflow and outflow of water. Further increase, he added, in water discharge could plunge the reservoir to the dead level before snow started melting in its catchment areas, which usually began in May.

Data collected from official sources on Wednesday revealed that the total discharge from the dam was 37,000 cusecs against the inflow of 25,600 cusecs and the level was 1378.43 feet against the dead level of 1369 feet. Electricity generation from the reservoir was 1,542 megawatts against the designed capacity of 3,478MW. Last year, the sources said, power generation on this day was 2,263 megawatts.

They said unchecked sedimentation mainly caused by massive deforestation in the dam’s catchment areas had developed a huge delta in the reservoir.

They said the delta was 50 miles long, 1 to 2 miles wide and its depth was 200 feet, which had caused accumulation of about 2.8 MAF of silt in the reservoir.

This mass of sediment has reduced the storage capacity of the reservoir and poses a threat to the electricity generation process.

Opinion

Editorial

Islamabad march
Updated 27 Nov, 2024

Islamabad march

WITH emotions running high, chaos closes in. As these words were being written, rumours and speculation were all...
Policing the internet
27 Nov, 2024

Policing the internet

IT is chilling to witness how Pakistan — a nation that embraced the freedoms of modern democracy, and the tech ...
Correcting sports priorities
27 Nov, 2024

Correcting sports priorities

IT has been a lingering battle that has cast a shadow over sports in Pakistan: who are the national sports...
Kurram ceasefire
Updated 26 Nov, 2024

Kurram ceasefire

DESPITE efforts by the KP government to bring about a ceasefire in Kurram tribal district, the bloodletting has...
Hollow victory
26 Nov, 2024

Hollow victory

THE conclusion of COP29 in Baku has left developing nations — struggling with the mounting costs of climate...
Infrastructure schemes
26 Nov, 2024

Infrastructure schemes

THE government’s decision to finance priority PSDP schemes on a three-year rolling basis is a significant step...