Engineers inspect Toshiba's four-legged robot during a demonstration at Toshiba's technical center in Yokohama, suburban Tokyo on November 21, 2012. Toshiba developed a tetrapod robot, enabling it to carry out investigative and recovery work in TEPCO's Fukushima nuclear power plant. The robot weighs 65 kilograms and can move over uneven surfaces. - AFP Photo

YOKOHAMA, Japan, Nov 21, 2012 - Japanese nuclear reactor maker Toshiba on Wednesday unveiled a remote-controlled robot resembling a headless dog that they hope will be used at the battered Fukushima power plant.

The tetrapod, which weighs 65 kilograms (143 pounds) and is about one metre (3 foot, four inches) tall, is designed to be able to cover difficult terrain - such as going up steep steps - that regular robots struggle with.

The robot's triple-jointed legs are designed to give it maximum flexibility, with engineers saying it will be able to go into spaces where high radiation makes it impossible for workers to do so.

The robot can carry a load of 20 kilograms and is equipped with cameras and a radiation meter, expected to help workers decide which parts of buildings are safe to enter and for how long.

Toshiba's four-legged robot climbs steps during a demonstration at Toshiba's technical center in Yokohama, suburban Tokyo on November 21, 2012.  - AFP Photo

The machine can also carry a small wired vehicle equipped with a camera and send it out to crawl into small spaces to carry out inspections.

Toshiba engineer Goro Yanase said the as-yet unnamed robot could be upgraded to carry more than 80 kilograms, climb ladders and step over obstacles up to 50 centimetres (20 inches) high.

Robots have already been used inside the wrecked plant to take video footage, including the US-made PackBot and Japanese-made Quince crawler robots, but Toshiba is awaiting the go ahead from plant operator TEPCO to deploy its creation.

The massive earthquake and tsunami of March 11 last year sparked an atomic emergency at the Fukushima Daiichi plant in the northeast of the country.

Efforts to clear up after the worst nuclear disaster since Chernobyl in 1986 are still continuing, with high levels of radiation hampering operations.

The decommissioning of the crippled plant is expected to take several decades.

Opinion

Editorial

Closed doors
Updated 08 Jan, 2025

Closed doors

The nation’s fate has been decided through secret deals for too long, with the result that the citizenry has become increasingly alienated from the state.
Debt burden
08 Jan, 2025

Debt burden

THE federal government’s total debt stock soared by above 11pc year-over-year to Rs70.4tr at the end of November,...
GB power crisis
08 Jan, 2025

GB power crisis

MASS protests are not a novelty in Pakistan, and when the state refuses to listen through the available channels —...
Fragile peace
Updated 07 Jan, 2025

Fragile peace

Those who have lost loved ones, as well as those whose property has been destroyed in the clashes, must get justice.
Captive power cut
07 Jan, 2025

Captive power cut

THE IMF’s refusal to relax its demand for discontinuation of massively subsidised gas supplies to mostly...
National embarrassment
Updated 07 Jan, 2025

National embarrassment

The global eradication of polio is within reach and Pakistan has no excuse to remain an outlier.