Chiniot Dam Project given go-ahead

Published January 2, 2009

JHANG The Chiniot Dam Project, on the River Chenab, between Chiniot and Chenab Nagar, will be completed at a cost of Rs24 billion, a senior provincial minister was told here on Thursday.
Senior Minister Raja Riaz Ahmad was told during a briefing at Old Bridge that the dam would generate 60 megawatt hydropower and stock up water for irrigation. It would provide water for cultivation of 264,000 tons of wheat. Its construction was likely to start in the beginning of next fiscal year.
Wapda General Manager (Planning) Dr Siddique said at the briefing that the planned dam would have a barrage capacity of 1 million cusecs and storage capacity of 1.29 million acre feet. The total length of the dykes would be 44 miles and their height would be 39 feet. The environmental and rehabilitation cost had been estimated at Rs5.2 billion and Rs5.1 billion would be spent on a power house.
He said the construction of dam would result in availability of water valuing Rs2.92 billion and hydropower worth Rs0.92 billion. The PC-II of the feasibility study had been completed for submission to the federal government. Irrigation experts said the flood protection embankment up to Pindi Bhattian would be fortified.
Raja Riaz, while talking to the media, said the government wanted to construct a storage dam on the River Chenab at Marala in Sialkot to save Chenab water for irrigation. He said the Irrigation Department was implementing a strategy for maintenance and improvement of colossal canal assets and setting up new hydel and hydro power projects at canal and barrage sites.
Earlier, the senior minister and Wapda Chairman Shakeel Durrani inspected the dam site and sought information from experts about technical aspects of the project.
Expressing their concerns at the planned dam, National Assembly Member from Chiniot Anayat Ali Shah and Pakistan People's Party representative Qazi Ali Hassan said a large area of highly fertile farm land would be affected by water logging and salinity caused by the pond area of the project, hundreds of villages would be wiped out and more than 100,000 people would be displaced.

Opinion

Who bears the cost?

Who bears the cost?

This small window of low inflation should compel a rethink of how the authorities and employers understand the average household’s

Editorial

Internet restrictions
23 Dec, 2024

Internet restrictions

JUST how much longer does the government plan on throttling the internet is a question up in the air right now....
Bangladesh reset
23 Dec, 2024

Bangladesh reset

THE vibes were positive during Prime Minister Shehbaz Sharif’s recent meeting with Bangladesh interim leader Dr...
Leaving home
23 Dec, 2024

Leaving home

FROM asylum seekers to economic migrants, the continuing exodus from Pakistan shows mass disillusionment with the...
Military convictions
Updated 22 Dec, 2024

Military convictions

Pakistan’s democracy, still finding its feet, cannot afford such compromises on core democratic values.
Need for talks
22 Dec, 2024

Need for talks

FOR a long time now, the country has been in the grip of relentless political uncertainty, featuring the...
Vulnerable vaccinators
22 Dec, 2024

Vulnerable vaccinators

THE campaign to eradicate polio from Pakistan cannot succeed unless the safety of vaccinators and security personnel...